On Wednesday, a bridge near Shenandoah that was being worked on and later closed due to a hole in the deck, has reopened.
The PA 924 bridge over Kehly Run in Shenandoah Borough reopened Wednesday after the hole was repaired.
Original story on closing
http://www.skooknews.com/2016/04/shenandoah-bridge-closed-until.html